* add calculated values to VE.Direct data
solar current, battery output power, and the charger's efficiency can be
calculated from the values reported by the charger. the efficiency must
be taken with a grain of salt. it seems that the solar power value and
the battery output voltage/current are not always in sync. for that
reason a moving average is used to smooth out the calculated efficiency
value.
* show calculated VE.Direct values in web live view
order the values and translations similarly for the input and output,
starting with power at the top, then voltage, then current as the last
of these three.
* VE.Direct live view: use 'd' as unit for days
'd' is the SI unit symbol for days and does not need translation, which
is desirable as units are not translated throughout the project.
* refactor VE.Direct live view
* move Dynamic Power Limiter data into its own type.
* split VE.Direct data into three types: "device", "input", and
"output". hence all input and output values are now ValueObject, which
allows to iterate over them using a loop without typing issues.
* generate the tables with input and output values using a loop, rather
than defining each row individually.
* localize numbers using $n (vue method), which fixes switching the
number format (dot vs. comma) when switching the language.
* use no decimal point for power values (they are integers), three
decimal points for kWh values (charger only reports two decimal
places, but three are easier to read since the unit is *kilo* Wh), one
decimal point for the efficiency, and two for voltage and current.
* update language tokens to avoid mapping JSON keys to language keys
(use the JSON keys to access the language tokens).
* re-structure language tokes so the brief keys took over from
VeDirectFrameHandler always make sense (nest into "input" and
"output").
* order values similarly from top to bottom: power, then voltage, then
current. this is following the order of the inverters' details.
* group values by type/unit (yield and max. power) and order them
"newest" to "oldest" from top to bottom.
* increase the DynamicJsonDocument as it was too small to hold the newly
added data.
* update webapp_dist to include VE.Direct live view refactoring
Webinterface change to set full solar passthrough values
Adding webapi and config changes to enable full solar passthrough over certain battery Soc
inital version of full solar passthrough in power limiter
Passthrough mode can be enabled via MQTT
translations
re-enable comment
remove unused variable
User asked for TLS client certificate based login from DTU to MQTT
server. This PR implements storage and use of x509 client certificate
and private key.
Signed-off-by: Martin Dummer <martin.dummer@gmx.net>
* add support for energy & power readings on SML based power meters, taking OBIS 16.7.1 for power (using mod. SML Parser lib. by olliiiver)
* switched SML read to use software serial
* made total power meter response controled by meter source to obtain either the sum of phase powers or explicit total power provided by meter
* made mqtt subscriptions to power meter topics meter source dependend
* simplified SML read loop and OBIS handler registration, + minor refactoring
* minor cleanup/style changes and optim. PowerMeter
* fixed build, add SOURCE_SML == 4
* removed optional usage of HW serial for SML power meter
* switched to usage of _powerMeter1Power for SML power reading to allign better with existing code
---------
Co-authored-by: helgeerbe <helge@erbehome.de>
The Firmware Version link now referes to the release page if the given hash is a tag. It referes to the commits page if it's really a hash. (Implements #778)